ORDER CONFIRMATION
Project kicks off upon receipt of deposit.
LAYOUT DRAWING
3 to 7 days for layout drawings.
DETAILED DESIGN
Mold components with detail drawings.
DRAWINGS CONFIRMATION
Drawings are finally confirmed by customer.
SCHEDULE
Follow up the schedule.
MOLD MANUFACTURE
Mold manufacture on schedule.
MOLD TESTSAMPLE SUBMITTED
Mold trial running on schedule, and Samples are submitted with a detailed inspection report.
SAMPLE CONFIRMATION
After inspected final samples according to specifications customer make a confirmation.
PACKING
Tooling finished and packed.
DELIVERY
Paperwork and a CD of assembly drawings are sent to customer at the time of the shipment of the mould.